

After a long wait Casson Road in Workington has started on site. The project is for 20 residencies, a mixture of semi detatched two story and semi detached bungalows for a local housing association. The properties have been designed to Code for Sustainable Homes 3 standards with whole house ventilation systems, increase insulation and timber frame constructions. The contractors are Thomas Armstrong Construction from Flimby.